依據招標文件中的要求,承建人在本工程中的所購買的材料必須滿足設計和施工規范要求,并提供產品的合格證書(需要試驗合格后材能使用的,同是時必須提供產品試驗合格證和試驗報告)經招標人、監理認可后方可使用,否則將視為違約,由此造成的一切由承建人承擔,包括招標人由此產生的費用。
熱心網友
In accordance with the requirements in the RFP, the materials procured for this engineering project by the constructor shall comply with the terms and requirements of the norms for design and construction。 The constructor shall also provide the qulified certificates for the products, (if the products need testing before adoption, the testing qulifications and testing reports shall also be provided,) and such certificates cannot be valid without the approval by the tender and supervisor。 That no above-mentioned documents and certificates approved will be regarded as contract breaching, and all liabilities including the expenditures caused then will be solely sponsored by the constructor itself。
熱心網友
依據招標文件中的要求,承建人在本工程中的所購買的材料必須滿足設計和施工規范要求,并提供產品的合格證書(需要試驗合格后材能使用的,同是時必須提供產品試驗合格證和試驗報告)經招標人、監理認可后方可使用,否則將視為違約,由此造成的一切由承建人承擔,包括招標人由此產生的費用。In accordance with the requirement of the documents of bid invitation, the contractor shall purchase materials meeting the requirement of norms on design and construction of engineering, and present the quality certificate (where the materials can be used only after test, the testing report or testing certificate shall be presented with it at the same time ) to the tenderee and the supervisor for approval before use。 Otherwise, it shall be deemed as breach of contract,and all the consequent results shall be assumed by the contractor, including expenses therefrom occur to the tenderee。