4.質(zhì)量事故或不合格品的處理1)凡施工現(xiàn)場出現(xiàn)的質(zhì)量事故或不合格品,均按質(zhì)量體系程序文件《不合格品控制程序》(Q/7y·G04·04-99)中的規(guī)定進(jìn)行評審鑒定,評審結(jié)果分為報(bào)廢、讓步接收、降級處理、返工和返修五類。2)經(jīng)過返工或返修后的工程或部位須重新檢驗(yàn)和評審鑒定。3)按質(zhì)量體系程序文件《糾正和預(yù)防措施控制程序》(Q/7y·G04·05-99)要求,由質(zhì)量管理部組織對質(zhì)量事故或不合格品產(chǎn)生的原因進(jìn)行分析,提出質(zhì)量事故或不合格原因報(bào)告。4)主要責(zé)任部門制定糾正措施計(jì)劃,經(jīng)審批后實(shí)施。5)質(zhì)量管理部組織有關(guān)部門和人員對糾正措施效果進(jìn)行驗(yàn)證,并提出糾正措施驗(yàn)證報(bào)告。

熱心網(wǎng)友

4。質(zhì)量事故或不合格品的處理1)凡施工現(xiàn)場出現(xiàn)的質(zhì)量事故或不合格品,均按質(zhì)量體系程序文件《不合格品控制程序》(Q/7y•G04•04-99)中的規(guī)定進(jìn)行評審鑒定,評審結(jié)果分為報(bào)廢、讓步接收、降級處理、返工和返修五類。4。 The Procedure for quality related accident and unqualified constructions1)All of quality related accident in job location and unqualified constructions need to be reviewed according to the quality system procedure document (Q/7y - G04 - 04-99)。 As a result, those constructions will be divides into different treatment, including discards, the concessions receive, degraded treatment, redo the work, and fix the work。2)經(jīng)過返工或返修后的工程或部位須重新檢驗(yàn)和評審鑒定。2) Those constructions after redo or fix need to review and prove again。3)按質(zhì)量體系程序文件《糾正和預(yù)防措施控制程序》(Q/7y•G04•05-99)要求,由質(zhì)量管理部組織對質(zhì)量事故或不合格品產(chǎn)生的原因進(jìn)行分析,提出質(zhì)量事故或不合格原因報(bào)告。3) According to the quality system procedure document (Q/7y - G04 - 05-99), the quality control department need to schedule a meeting to analyze “why” and “how” quality related accident happened and need to submit a written report。 4)主要責(zé)任部門制定糾正措施計(jì)劃,經(jīng)審批后實(shí)施。4) the main responsibility parties need to make an plan for correction, implements after the examination and approval。5)質(zhì)量管理部組織有關(guān)部門和人員對糾正措施效果進(jìn)行驗(yàn)證,并提出糾正措施驗(yàn)證報(bào)告5) the quality control department need to approve and conform the correction plan and submit a written report for the result。。

熱心網(wǎng)友

4。質(zhì)量事故或不合格品的處理4。Procedure for sub-standard quality works and unpassed works。1)凡施工現(xiàn)場出現(xiàn)的質(zhì)量事故或不合格品,均按質(zhì)量體系程序文件《不合格品控制程序》(Q/7y·G04·04-99)中的規(guī)定進(jìn)行評審鑒定,評審結(jié)果分為報(bào)廢、讓步接收、降級處理、返工和返修五類。1) If any sub-standard quality works or unpassed works are found during the progress period, shall accord to the Quality Assurance Specification (Q/7y·G04·04-99),to be classified in five categories。 1。Banned 2。Accepted with conditions 3。Downgraded 4。Rectified intenaced。2)經(jīng)過返工或返修后的工程或部位須重新檢驗(yàn)和評審鑒定。2)All rectified or maintenaced works shall be re-examined and re-classified。3)按質(zhì)量體系程序文件《糾正和預(yù)防措施控制程序》(Q/7y·G04·05-99)要求,由質(zhì)量管理部組織對質(zhì)量事故或不合格品產(chǎn)生的原因進(jìn)行分析,提出質(zhì)量事故或不合格原因報(bào)告。According to the Quality Assurance Specification (Q/7y·G04·05-99)。 Quality Assurance Department shall analyze the factors caused and a report to be announced for the sub-standard quality works or unpassed works。4)主要責(zé)任部門制定糾正措施計(jì)劃,經(jīng)審批后實(shí)施。4)A major respondsible department shall draft a Rectifications Plan。 The plan to be implied to all works after approved5)質(zhì)量管理部組織有關(guān)部門和人員對糾正措施效果進(jìn)行驗(yàn)證,并提出糾正措施驗(yàn)證報(bào)告。Quality Assurance Department shall organise the related parties to verify those rectification measures and issue a feasibility report。

熱心網(wǎng)友

4。 The quality accident either not qualified processing 1) every job location appears the quality accident or is not qualified, all presses the quality system procedure document " not qualified control procedure " (Q/7y - G04 - 04-99) the center stipulation carries on the appraisal appraisal, the appraisal result divides into discards, the concessions receive, degrades processing, does over and repairs a second time five kinds。 2) either after repairs a second time the project undergo doing over or the spot must 重新檢驗(yàn) and the appraisal appraisal。 3)" correction and preventive measure control procedure " (Q/7y - G04 - 05-99) requests according to the quality system procedure document, or is not qualified by the quality control department organization to the quality accident the reason which produces carries on the analysis, proposes the quality accident or the not qualified reason report。 4) the main responsibility department formulates the correction measure plan, implements after the examination and approval。 5) the quality control department organization department concerned and the personnel to corrects the measure effect carries on the confirmation, and proposes the correction measure confirmation report。